gpt-image-1.5 Shuts Down Dec 1: Your Migration Checklist
OpenAI retires gpt-image-1.5, gpt-image-1-mini and chatgpt-image-latest on December 1, 2026. Azure has a separate date. What to check first.

Your gpt-image-1.5 calls stop working on December 1, 2026. That is a Tuesday, and it is days away.
OpenAI retires three image model IDs on that date, and a November 27 migration write-up from developer-tools vendor Versyka lays out which replacements map to what, plus a second Azure deadline that does not share the calendar.
The three IDs and their replacements
| Model ID | Replacement |
|---|---|
gpt-image-1.5 | gpt-image-2.5-sunburst or gpt-image-2.5-flare |
gpt-image-1-mini | same |
chatgpt-image-latest | same |
On Azure the timing differs. The gpt-image-1.5 (2025-12-16) deployment carries its own retirement date of December 16, 2026. Same model name, different calendar. Teams running on both platforms are managing two deadlines, not one.
Why image features break quietly
Image generation is usually a side feature — avatars, thumbnails, a "generate a cover" button, an internal tool. Side features do not get a migration ticket. They get a bug report, often days later, because the rest of the app keeps working fine.
That is the actual risk profile here. A hard shutdown of a core chat model gets caught in minutes. A dead avatar generator can sit broken through a weekend before anyone files anything.
What to check before Tuesday
Start by finding every reference, not just the ones in application code:
grep -rnE "gpt-image-1|chatgpt-image" .
Then widen the search beyond the repo. Environment variables count. So does anything stored per customer — a saved "style" setting that pins a model ID will outlive your code change.
Picking between the two replacements is an empirical call, not a spec-sheet one: run the same ten real prompts through sunburst and flare side by side. Image quality differences are easier to judge than to describe.
Two more checks worth doing before you flip the switch. Parameters do not always carry over unchanged between model families — sizes, quality settings and output formats can shift, so generate one image at every size your app actually uses. And confirm cost per image at the settings you really run, not the defaults, before migrating everything.
The deploy-freeze trap
This is the detail most likely to bite. If your team freezes deploys over the Black Friday weekend, the migration has to ship before that freeze starts — otherwise the feature breaks in the middle of it, with the change blocked by your own process.
Check the calendar against your freeze window first, before you start comparing image quality. The engineering work here is an afternoon; getting it through a closed deploy window is not.
Worth watching: the Azure split means one provider can hand you two different retirement dates for what looks like a single model. If you are not already recording both the model ID and the platform it runs on in whatever tracks your third-party deprecations, this is the week to start.
More from DangMua